1. Start From The Accepted Close-Out
Anchor the handoff to the approved proof pack and the resolved balance step so the final packet still points to a completed deal.
Open Partner Intro Balance Open Partner Intro Proof PackSignal Foundry
Revenue Partner Intro Final Handoff BoardWarm intro final packet page
This page is for the stage after the proof pack is accepted and the remaining payment route is already clear or complete. The job now is not more review. It is clean transfer: deliver the final assets, operating notes, visibility rules, and scope boundary in one packet so the finished first step is usable, reusable, and clearly separated from any next cycle.
Final Handoff Map
Anchor the handoff to the approved proof pack and the resolved balance step so the final packet still points to a completed deal.
Open Partner Intro Balance Open Partner Intro Proof PackSend the owner-facing materials, not a dump of every artifact produced during the cycle.
Open Handoff BoardMake it explicit what stays partner-led, what can become direct, and what should remain invisible in any reuse of the work.
Open Partner Intro VisibilityKeep the current first step closed so optional new work does not muddy the packet that closes this cycle.
Once the final packet is sent, route any proof-safe summary into the partner proof system without exposing hidden details.
Open Partner Intro Proof CaptureIf there is more work to do, route that into renewal, repeat, or a fresh scope instead of blending it into this close-out packet.
Open Partner Intro Renewal Open Partner Intro RepeatWhat The Packet Includes
The final pages, flows, summaries, SOPs, or notes that belong to the completed first step.
The shortest practical explanation needed so the owner can use the shipped work without guesswork.
The final statement on whether future communication stays partner-led, shared, or direct.
The reminder of what was completed and what belongs in a new cycle if the buyer wants more work.
One concise result line that can be reused only if it is approved for partner-safe proof capture.
One explicit route after handoff: done, proof capture, renewal, or repeat channel motion.
Short Close-Out Lines
The current step is closed, so I am sending one final packet with the shipped assets, owner notes, and the visibility boundary.
If there is another bottleneck to fix after this, I want to scope it separately so the completed step stays commercially clean.
If any of this is useful as proof later, I will route only the approved summary into the partner-safe proof path.
With the packet sent and the payment handled, the current cycle is fully closed and the next step can be chosen separately.
Do Not Do This
Once the packet is being handed over, do not let the completed work expand into a fresh revision round or hidden rebuild.
The packet should stay useful. Too many links and drafts create another sorting problem instead of a clear close-out.
If the partner stays in front, keep that explicit. Final handoff is a common place for this to drift accidentally.
Mention the next route if useful, but keep the current handoff separate from any new commercial decision.
Best Next Routes
If the remaining payment is not actually settled or the ask still feels loose, route back to the intro balance page first.
Open Partner Intro BalanceIf the close-out packet still depends on one last in-scope change or a tighter summary, fix that before final handoff.
Open Partner Intro Revision Open Partner Intro Proof PackIf the project is no longer really a partner-intro close-out, switch to the broader handoff board.
Open Handoff BoardIf the final packet is sent and the next job is proof reuse, move into partner proof capture now.
Open Partner Intro Proof CaptureIf the current step is closed and the buyer wants more, route into a separate renewal decision.
Open Partner Intro RenewalIf the result should become a reusable partner lane, route into the repeat channel system after close-out.
Open Partner Intro RepeatWallet
Keep the same wallet-backed trail tied to the completed step. Once the payment and packet are done, choose the next motion separately instead of blending it into close-out.
0xB3e9568A9cbB624403743340358c85CCce130893
Open Payment Page